- Once a project is sized and the site is selected, it must register with ERCOT.
- The planning, design and interconnection of these projects are driven by requirements provided by ERCOT and a process that is outlined by the PUCT.
- One of the requirements is that the project owner must also conduct a Full Interconnection Study to analyze the impact on the transmission system, and includes the identification and location of an interconnection point and substation.